Skip to content
Document 05, Services

Services /05

What the studio does, put plainly. Four families, from an object on a table to a file lodged at the town hall. Each has its own page. Lyon and Paris.

Interiors & fit-out

The heart of the studio. The scale of the inhabiting body: a flat being redone, a shop opening, an office reorganised. From survey to detail book, down to the last setting-out.

  • Interior design & fit-out

    Design and follow-through, from sketch to delivery.

  • Detail book & setting-out

    Floor and finish reference books, DWG details.

  • 3D views

    Images to decide before starting.

Planning permissions

The file to lodge, assembled in full and lodged at the town hall. First, the question that matters: will it pass? The feasibility study answers it, and its cost is deducted from what follows.

  • Feasibility study

    Site visit, local plan analysis, written note, siting sketch.

  • Prior declaration (DP)

    Complete file lodged at the town hall.

  • Building permit — house, extension

    CERFA form, PCMI documents 1 to 8, notices. Within the threshold below.

  • Amending permit

    Amended documents and file reconciliation.

Design & site

When the project goes all the way: drawings, tendering, then site guidance in an advisory capacity, through to the execution file. Renovation costs more than new build — the existing always has something in store.

  • Full commission

    From sketch to the execution file; site follow-up given as advice, not site direction.

  • Tender package (DCE)

    Specifications, cost breakdown, contractor consultation.

  • Site advice

    Visits, minutes and advice as work progresses — no site direction, no payment-certificate approvals.

  • Advice and short studies

    An opinion, a check, a short study, charged by the hour.

For practices

Extra hands that take the file on, by the day. Drawings, images, maps, models: what is missing when a deadline nears.

  • Production for practices

    DWG, construction drawings, 3D, layout. By the day.

  • Mapping & GIS analysis

    Thematic maps in QGIS, from national survey data.

  • 3D-printed model

    Competition or presentation model.

The 150 m² threshold

Kelliane Guerin is a State-certified graduate in architecture (ENSA Lyon) and is not on the Order’s register. Private individuals building for themselves must engage a registered architect once the whole exceeds 150 m² of floor area or footprint — the total after works, not the extension alone. A company must engage one whatever the area. Below that, nothing stands in the way; above it, the project is carried by a registered architect as its author, and the studio works alongside them. Better said here than discovered at lodging.

How it works

  1. 01

    You write

    The place, the brief, the timeline: three lines are enough. Reply within 48 h.

  2. 02

    First exchange

    A call or a coffee at the studio: framing the need, the budget and the right level of service.

  3. 03

    Visit & proposal

    On-site survey, then a clear proposal: scope, phases, fees.