Plancher, rue Sainte-Marthe
Structural repairParis (10ᵉ)Upper floors over the ground, first and second storeysSupported by Christian Perdereau · ETMP

Plate N° 15

01 · The project
The second-floor ceiling structure is at fault: attacked joists, disorders visible on the ceiling below. The findings are recorded on site, in photographs, before any drawing begins, they decide what can be kept.
Plancher, rue Sainte-Marthe · The survey on site

02 · Programme & uses
Shoring comes first: the floor is relieved while the decision is made. Then two complete options are drawn and priced, replace the joists, or strengthen what is there. They are not rivals on principle, they give the co-owners something to choose from with full knowledge, with a cost set against each option.
Plancher, rue Sainte-Marthe · Two costed options

03 · The site
The co-owners decided, and the works followed: underpinning, shoring, floor rebuilt. The last photograph in the file shows a finished room, a clean ceiling, that is, the moment when the work stops being visible.
Plancher, rue Sainte-Marthe · The work disappears
04 · Technical sheet
- Location
- Paris (10ᵉ)
- Year
- 2021
- Area
- Upper floors over the ground, first and second storeys
- Programme
- Repair of the second-floor ceiling structure: two designed and priced options
- Client
- Syndicat des copropriétaires
- Commission
- Assistant draughtsman · ETMP
- Status
- Supported by Christian Perdereau · ETMP
05Documents
05 sheets
Existing floor structure · sections01

Floor repair framing plan02

Section · project03

The site works04

Site works · underpinning05